Beach Energy downgrades Waitsia gas reserves ahead of cost increase

أكثر من سنة فى theage

Kerry Stokes-backed Beach Energy has cut its Perth Basin gas reserves after disappointing drilling results and expects a delay and cost bump at its Waitsia project that was being built by failed contractor Clough.

ذكر فى هذا الخبر
شارك الخبر على