New way to beat bridge’s acid soil

almost 6 years in cairnspost

NORTH GEELONG engineering firm Austeng has designed a long-term solution to the unstable soil issues that have delayed a project to build pedestrian bridges that can survive 100 years without maintenance.

Mentioned in this news
Share it on